Name the top working floor and how the crew gets up. Units land a short trip from the work, with service days planned for the height.

Porta potties for high-rise construction

High-rise porta potty rental in Brooklyn starts with the top working floor and how people get down from it. Brooklyn Porta Johns gets units set up for site supers and GCs on tower and mid-rise jobs in Brooklyn, NY, such as the waterfront towers in Greenpoint.

On a low building, a bank of units at the gate does the job. On a tall one, the walk down and back eats into the shift, and if it takes too long the toilet stops counting as available. The crew-size count still comes from OSHA’s table on the New York portable toilet regulations page. Height decides where those units go.

OSHA, letter of interpretation, February 23, 2005

"Toilets that take too long to get to are not 'available.'"

The reply to a question about a crew on a 10th floor with stairs as the only way down.
The nearby test

How close to the crew should the units be?

A contractor asked OSHA about a crew on the 10th floor, with stairs as the only way down. OSHA said "provide" means available. It treats toilets as nearby if the trip takes less than 10 minutes.

The trip runs from the work spot to the toilet. It counts the hoist wait, the walk across the deck and every flight of stairs.

Where do units go on a high-rise job?

Tell us roughly how long the trip takes from the top working floor at shift change, when the hoist is busiest. The rows below show what eats the minutes on each kind of building.

Travel time is the test in each case. These rows raise questions; none of them sets a floor count.
How the crew movesWhat eats the minutesWhere units usually end up
Stairs onlyEvery floor down and back up. A long walk from the stair core to the far side of the deck adds more.On or near the working floors, moved up as the frame climbs.
Personnel hoistWaiting for the car, worst when it’s hauling material.At grade plus a landing floor or two, if the wait stays short.
A building elevator on temporary useAccess rules from the owner or the elevator contractor, and the hours it’s shut down.Depends on who controls the car. Plan for the days it’s out of service.
Crane only, no hoist yetStairs. A crane moves loads, not people.Treat it as stairs only until a hoist runs.

How does a unit get up to the deck?

It has to work with your lift plan and your crane or hoist operator, so tell us about both early.

By hoist. A standard unit is tall and narrow. Measure the car’s door opening and inside height, and give us both numbers. We’ll get you the unit’s size and its empty weight. The hoist has a rated load, and the unit rides up with an empty tank.

By crane. A crane pick needs a safe way to rig the unit. Ask us if the units have a lifting frame or hook points built for it. If not, they go up in a cage or on a platform your rigger supplies. Never let anyone rig a unit by the roof vent or the door frame. Neither one carries the unit’s weight.

On the deck. Once it lands, the unit needs level footing away from the slab edge and any openings, and a tie-down so the wind can’t tip it. An open frame catches more wind up top than the street does. Ask us what tie-down the site needs to supply, and write it into the lift plan.

How does a unit up high get pumped?

The vacuum truck parks on the street. Its hose reaches the curb, not the 14th floor. Upper-floor units can be serviced in different ways, and the method changes the price and the schedule. You’ll have it in writing, with the price, before the first unit goes up.

We’ll go through these with you on the first call:

  • How units on upper floors get serviced, and what the site has to provide
  • Whether service days need hoist time, and at what hour
  • Whether upper-floor service is priced differently from a unit at grade
  • Who moves a unit when the crew moves up, and how much notice that takes
  • What happens if the hoist is down on a service day
  • How service days are counted when units sit on several floors

Can the units move up as the building does?

A tall building rarely keeps one setup for more than a few months. Give us the schedule up front, so the moves go on the quote along with the rent. A build this long suits a monthly porta potty rental term, and the moves and extra units fit inside it.

  1. Excavation and foundations

    Everyone works at or below grade. Units sit at the gate or on the lot, where the truck reaches them.

  2. Frame going up

    Crews move higher every few weeks. Start timing the trip down once the deck passes the first few floors.

  3. Enclosure and interior trades

    Headcount usually peaks and spreads over many floors at once. Expect to add units and spread them out.

  4. Permanent bathrooms open to the trades

    Units come down once working toilets are open to the crew, and not before.

What supers ask about units up high

Does every floor need its own porta potty?

No. No rule says one per floor. The test is travel time from the work. With a fast personnel hoist, units every few floors may keep the trip short. On stairs only, they usually sit closer to the working floors.

Can the building’s own bathrooms count once they’re in?

Only when they work and the crew can use them for the rest of the job. A finished toilet the owner has locked for turnover doesn’t count.

What if a unit tips during a crane pick?

That comes down to the rental agreement and the lift contract, so settle it before the first pick. Ask us what the damage waiver covers, and whether it leaves out units lifted with the site’s own crane or hoist.

Do upper-floor units need a handwash station too?

Yes, if the crew on that floor paints, coats or handles other harmful materials. OSHA expects washing facilities near that work. The handwash station page covers when it applies.

Call with the top floor and the hoist plan

Tell us whether the crew rides a hoist or takes the stairs, and the headcount on the busiest floor. We’ll plan where the units sit and how they get serviced.